Whirlpool Gold WFD193 Installation Instructions Manual page 19

93 percent convertible multispeed gas furnace
Hide thumbs Also See for Gold WFD193:
Table of Contents

Advertisement

Vent/Flue Pipe Cuts
A. Flange
B. Cut location
8. Remove the plastic plug from the alternate vent/flue location.
9. Relocate and install the plastic plug in the standard vent/flue
location (base pan).
10. Insert the plastic plug (included in the drain kit bag) into the
remaining hole in induced draft blower deck.
11. Insert the cut section of the vent/flue pipe and rubber
coupling into the alternate vent/flue location.
12. Attach the vent/flue pipe and coupling to the induced draft
blower using a rubber coupling and worm gear hose clamps
provided in the drain kit bag.
13. Secure the rubber coupling to the cabinet using the screws
removed in Step 1 or with field-supplied ³⁄₈" #8 self-drilling
screws.
WARNING
The rubber elbow is not designed to support a load.
Goodman 57
When the rubber elbow is mounted externally to the
furnace cabinet, extreme care must be taken to adequately
support field-supplied vent/flue piping, as damage can
result in leaks causing bodily injury or death due to
exposure to flue gases, including carbon monoxide.
14. For upright installations, externally mount the rubber elbow to
the vent/flue coupling using a worm gear hose clamp.
15. Secure the field supplied vent/flue piping to the rubber elbow
using a worm gear hose clamp.
NOTE: Use of the alternate vent/flue location for upright
installations, requires the drain trap to be installed on the
same side of the furnace as the flue pipe.
16. For horizontal installations, externally secure the field
supplied vent/flue pipe directly to the vent/flue coupling using
a PVC or ABS coupling or elbow.
A
C
B
C. 3 ³⁄₄ " (9.5 cm)
Alternate Vent/Flue Location—Counterflow
A. Vent/flue pipe
D. Plastic plug—alternate vent/flue location
B. Screw locations (4)
E. Rubber elbow
C. Screw locations (3)
F. Induced draft blower
Alternate Vent/Flue Location—Upflow /Horizontal
(Counterflow Similar)
A
A. Rubber coupling
B. Vent/flue pipe
Alternate Combustion Air Intake Location—Counterflow
1. Remove and save the 4 screws securing the combustion air
intake coupling to the base pan.
2. Remove the 3 screws securing the furnace's internal
combustion air intake pipe to the induced draft blower deck.
3. Remove the combustion air intake pipe from the furnace and
cut the pipe at the base pan coupling.
4. Save the base pan coupling and gasket from the induced
draft blower deck coupling for use in the alternate location.
Discard the remaining pipe.
5. Remove the plastic plug from the alternate combustion air
intake location.
6. Relocate and install the plastic plug in the standard air intake
location (base pan).
7. Insert the plastic plug (included in the drain kit bag) into the
remaining hole in the induced draft blower deck.
A
B
C
D
E
F
B C
C. Induced draft blower
19

Advertisement

Table of Contents
loading

This manual is also suitable for:

Gold wpio-299f

Table of Contents