Mira SILVER Installation And User Manual page 26

Thermostatic mixer
Table of Contents

Advertisement

3.6 Drill the two 5.5 mm holes for the
fixing positions (countersink the holes
at the front).
3.7 S e c u r e t h e M i x e r w i t h t h e
M5 x 40 screws as shown.
3.8 Fit the hot and cold supply pipes
(hot - left, cold - right) and tighten
the compression nuts.
Falling Supplies: For falling supplies
loosen the Grubscrew on each Elbow
using the 2.5 mm Hexagon Key
(supplied). Remove the Elbows and
install on opposite sides. Retighten
the Grubscrews.
Caution! Do not overtighten.
Caution! Make sure that the olives
are fitted and all pipework is flushed
through before connecting to the
Mixer.
3.9 Fit the outlet pipework, leaving
enough pipe through the wall to
temporarily cap off (refer to your
Shower Fittings Installation and User
Guide).
3.10 Turn on the water supplies and check
for leaks.
3.11 Fit the Shower Fittings, refer to your
Shower Fittings Installation and User
Guide for Instructions.
Note! For high pressure systems,
a 12 litre/minute flow regulator
(supplied) can be fitted under the
hose washer.
Important! The fitting of this flow
regulator will invalidate any TMV2
compliance due to the minimum flow
rate requirements. Do not fit the flow
regulator in TMV2 applications.
3.12 Fit the Concealing Plate and Control
Assembly, refer to section: 'Control
Assembly'.
Outlet Pipe
to Fittings
Hot Supply
26
M5 x 40 mm
Fixing Screws
Cold Supply

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents