Download Print this page
Cray CX1 Quick Start User Manual

Cray CX1 Quick Start User Manual

Hide thumbs Also See for CX1:

Advertisement

Quick Links

CRAY CX1
QUICK START USER'S GUIDE
Safety Information:
Enclosure Cover:
Before removing the CX1 system from its box,
In compliance with applicable safety, emission,
to prevent any damages to the system itself or
and thermal requirements, no covers should
injury to the person handling the CX1, all the
be removed and all bays must be filled with
safety cautions must be read.
compute shelves.
Installation and Service:
Electrostatic Discharge:
To avoid injury from electrical shock, only
Observe normal Electrostatic Discharge (ESD)
qualified technical service personnel can
procedures during system integration to avoid
perform any type of service or installation on
possible damage to the server board and/or
this system.
other components of the system.
CX1 QUICK START GUIDE SECTIONS
GETTING TO KNOW THE CX1
STAGE 1 - UNPACKING
(RED SECTION)
(BLUE SECTION)
GETTING TO KNOW THE CX1
FRONT PANEL
GET 1.1
Shipping Information:
Do not ship any CX1 compute shelves within the CX1
system chassis. Doing so may result in damage to
the CX1 system.
CX1 System Power:
The power cord must be disconnected before
installing or removing any shelves. Dedicate a
20 Amp AC Outlet exclusively to the CX1.
The high processor count of the CX1 could require
the draw of a full 20 Amp circuit.
STAGE 2 - PRE-ASSEMBLY
STAGE 3 - ASSEMBLY
STAGE 4 - POWERING THE CX1
(YELLOW SECTION)
(GREEN SECTION)
(GREY SECTION)
REAR PANEL
Future
USB 1
Expansion
(to front of system)
Power Inlet 110-250V
GET 1.2
UNPACKING
THE CX1 SKID PACK AGING
Box Contents
[1] Documentation Box
[2] Chassis Cart Box
[3] Rail Box
[4] Main Chassis Box
[5] Power Supply Box
[6] Blade Box
[7] Cables
[8] Accessories
THE CX1 ROADCASE PACK AGING
Unlocking the CX1 ROAD CASE
Remove the front portion of the case (2 latches on the right side)
USB 2
USB
(to DVD-ROM)
50-60Hz 20A
CX1 ROAD CASE
Package Contents
1
2
3
4
5
6
7
Qty
1
1
STEP 1
1
1
2
2
1
1
STEP 4
FRONT
2
1
3
4
6
5
5
STEP 2
STEP 3
1
7
2
5
4
6
5
8
3
6
BACK
7

Advertisement

loading
Need help?

Need help?

Do you have a question about the CX1 and is the answer not in the manual?

Questions and answers

Summary of Contents for Cray CX1

  • Page 1 Shipping Information: Before removing the CX1 system from its box, In compliance with applicable safety, emission, Do not ship any CX1 compute shelves within the CX1 to prevent any damages to the system itself or and thermal requirements, no covers should system chassis.
  • Page 2 If you are facing the rear of the main chassis, the recommended position for the blade designated position A1 is the top left-most location (A1, as indicated on the middle-portion of the backof the CX1 chassis, seen in figure ASM 1.2 below).
  • Page 3 With the blades now inserted, plug in the necessary cables including: • Power cable(s): If your CX1 system makes use of blades in both Zone A (slots A1 through A4) as well as Zone B (slots B1 through B4), you will need to connect a Power Cable to each power zone inlet.