Installation/Operation Flows; Installation Flow; About The Operation - Panasonic WJ-HXE400 Operating Instructions Manual

Extension unit
Table of Contents

Advertisement

Installation/operation flows

Installation flow

The installation flow of the extension unit is as follows.
Rack mounting
1
☞ Page 16
Connection
2
☞ Page 18
Turn on the devices
3
☞ Page 19
HDD unit
4
(Install the HDD units)
☞ Page 23

About the operation

The extension unit requires the recorder to set the operational mode of the HDD units or format them. Perform the setting using
the connected recorder.
Refer to the Operating Instructions of a corresponding recorder for further information.
Install the extension unit in the rack.
Go to step 2 when not installing it in the rack.
Connect the extension unit to the recorder.
Turn on the power of the extension unit.
Turn on the power of the extension unit before turning on the
power of the recorder.
Install the HDD units through the HDD insertion slot on the
front cover of the unit.
15

Advertisement

Table of Contents
loading

This manual is also suitable for:

Wj-hxe400/g

Table of Contents