Dunkirk DCC-150 Installation, Operation & Maintenance Manual page 15

Condensing wall mounted gas fired boiler
Table of Contents

Advertisement

12
11
10
9
8
7
Illustrations are a depiction of the boiler for general location of parts and may vary depending on model.
3 - COMPONENT LISTING
DUNKIRK DCC-205
5
6
4
2
3
ITEM
13
14
15
16
17
18
19
20
21
22
23
1
11
Dunkirk
DCC-205
NO.
1
Pump
2
Flow Sensor
3
DHW Priority Sensor
4
DHW Heat Exchanger
5
Gas Valve
6
NTC DHW Sensor
7
Low Water Pressure Cutoff
8
3-Way Valve with Motor
NTC Heating sensor (Flow/Return)
9
QTY 2, (1 Shown for clarity)
10
Water Safety Thermostat
11
Flue Sensor
12
Coaxial Connector
Heat Exchanger Temperature
13
Sensor
14
Heat Exchanger
Burner Door Temperature
15
Sensor
16
Burner (not shown)
17
Ignition Electrode
18
Flame Detection Electrode
19
Air/Gas Manifold
20
Air Purge
21
Venturi
22
Silencer
23
Fan
240011947 REV B, [03/31/2018]

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Dcb-125Dcb-165Dcc-205

Table of Contents