Samsung 510N Service Manual page 8

Tft-lcd monitor
Hide thumbs Also See for 510N:
Table of Contents

Advertisement

3 Disassembly and Reassembly
3-2 MJ19ES*/MJ19BS*/MJ19US*/MJ19QS* Disassembly
3-2
6. Remove 7 screws, 4 hexa screws from the boards
and lift up the boards.
Caution : When repairing panel only,
!
disconnect just LVDS cable, Panel-Lamp /
Wire marked in circle in the picture without
removing the screws on board in order to lift
the board up.
7. This picture is panel.
1. After placing monitor on the cushioned table,
remove 6 screws on the left and right of the
bottom.
2. Lift the stand and lift up the back cover.
3. Remove 2 screws from the shield.
4. Disconnect function cable from the cover front and
lift up the panel. Remove 4 screws from the panel
shield. (Right / Left)

Advertisement

Table of Contents
loading

This manual is also suitable for:

911n920n510t710n710t913n ... Show all

Table of Contents