Download Print this page

Raypak HD101 User Manual

Raypak boiler user manual

Advertisement

Quick Links

PART 1 - GENERAL
1.1
SUMMARY
A. Section includes gas-fired, copper finned-tube hydronic heating boilers
B. Related Sections
Specifier Note: Use as needed
1. Building Services Piping – Division 23 21 00
2. Breeching, Chimneys, and Stacks (Venting) – Division 23 51 00
3. HVAC Instrumentation and Controls – Division 23 09 00
4. Electrical – Division 23 09 33
1.2
REFERENCES
A. ANSI Z21.13/CSA 4.9
B. ASME, Section IV
C. 2006 UMC, Section 1107.6
D. ANSI/ASHRAE 15-1994, Section 8.13.6
E. National Fuel Gas Code, ANSI Z223.1/NFPA 54
F. I=B=R
G. NEC
1.3
SUBMITTALS
A. Product data sheet (including dimensions, rated capacities, shipping weights, accessories)
B. Wiring diagram
C. Warranty information
D. Installation and operating instructions
1.4
QUALITY ASSURANCE
A. Regulatory Requirements
1. ANSI Z21.13/CSA 4.9
2. Local and national air quality regulations for low NOx (<20 PPM NOx emissions) boilers
B. Certifications
1. CSA
2. ASME H Stamp and National Board Listed
3. ISO 9001
1.5
WARRANTY
A. Limited one-year warranty from date of installation
B. Limited twenty-year thermal shock warranty
C. Limited ten-year closed-system heat exchanger warranty
PART 2 - PRODUCTS
2.1
MANUFACTURER
A. Raypak, Inc.
1. Contact: 2151 Eastman Ave., Oxnard, CA 93030; Telephone: (805) 278-5300;
Fax: (800) 872-9725; Web site: www.raypak.com
Project Name / Date
Hi Delta SS™, TYPE H - MODELS HD101-HD401
SUGGESTED SPECIFICATIONS
DIVISION 23 52 33.13
FINNED WATER-TUBE BOILERS
Catalog No.:
2000.961
Effective:
6-25-09
Replaces:
New
Division 23 52 33.13 - 1

Advertisement

loading

Summary of Contents for Raypak HD101

  • Page 1 Hi Delta SS™, TYPE H - MODELS HD101-HD401 PART 1 - GENERAL SUMMARY A. Section includes gas-fired, copper finned-tube hydronic heating boilers B. Related Sections Specifier Note: Use as needed 1. Building Services Piping – Division 23 21 00 2. Breeching, Chimneys, and Stacks (Venting) – Division 23 51 00 3.
  • Page 2 (adjustable for two settings of five or ten minutes) to avoid standby losses associated with constant pump operation. G. Firing Mode 1. For models HD101 – HD401, provide two-stage fire control of the gas input to the boiler (on/off fire optional). H. Boiler Diagnostics...
  • Page 3 J. Venting 1. When routed vertically, the boiler’s flue material and size shall be in accordance with the National Fuel Gas Code, ANSI Z223.1/NFPA54 latest edition (Category I). 2. When routed horizontally, the boiler(s) flue material and size shall meet or exceed the requirements as specified for Category III in the National Fuel Gas Code, ANSI Z223.1/NFPA...
  • Page 4 5. Manufacturer’s installation instructions, including required service clearances and venting guidelines B. Manufacturer’s representative to verify proper and complete installation. START-UP A. Shall be performed by Raypak factory-trained personnel. B. Test during operation and adjust if necessary: 1. Safeties 2. Operating Controls 3.

This manual is also suitable for:

Hd401