Assembly - Ear Jack and Sub PBA (1/2)
1) Assemble sub PBA.
- If it is a new sub PBA, remove all
protection film and bend the outside of
sub PBA to make a shape for assembly.
- Assemble IF connector part first(①), and then attach sub PBA on the bracket.
- Softly press sub PBA one more with thumbs(②).
- In case of some models(G950U), fix the left side FPCB on the left guide rib(②-
- Fix 2 RF PCBs on the guide rib of the bracket wall(③).
①
②
- This document cannot be used without Samsung's Authorization -
G950F
※ Different shapes for SUB PBA by region.
②-
1
Rev1.0
G950U
).
1
③
Confidential