Sharp SJ-D20N-SLG Service Manual page 19

Table of Contents

Advertisement

2. EV-cover ass'y
1. Bind Fuse ass'y with L-band c. Then wind glass cloth tape (W25 x L50mm ) to lead wire of Fuse ass'y (Figure A-5).
2. Stick EVC-sealer a to square hole of EV-cover.
3. Set Fan motor ass'y to EV-cover. Then Fix with 2 tapping screw(Figure A-6) .
4. Set Fuse ass'y to EV-cover then stick aluminum tape (W39 x L35mm) and EV-cover al to EV-cover.
5. Set Def-thermistor to EV-cover and fix to Fan motor holder b with aluminum tape (W39 x L50mm ).
6. Insert the terminal of Def-thermistor to terminal no.5/No.6 and then insert the Fuse ass'y to the terminals No.1/No.2. on the 6P connector of Lead
EV-cover (Figure A-7).
7. After wiring at rear of EV-cover take out lead wire from square hole to front and fix with L-band c. Then stick EVC-sealer b to lead wire.
Note
Lead wire of Fuse ass'y must not over
EV-cover.
PL Process Note
Pins should be inserted surely, and check by pulling it.
L-band c
Fuse ass'y
L-band c
EVC-sealer a
EVC-sealer b
Fuse ass'y
Tapping screw
Stick Al-tape
from here
Aluminum tape
W39xL135
SCALE 2:1
FUSE
(BLACK)
(BLACK)
FAN MOTOR
(GRAY/ORANGE)
Glass cloth tape
W25xL50
Figure A-5
Lead EV-cover
Tapping screw
Fan motor ass'y
Fan motor ass'y
T
Tapping screw
Def-thermistor
L-band c
EV-cover al
Glass cloth tape
W25xL50
Stick EV-cover al
from this line
Figure A-6
(BLUE)
(BLUE)
DEF THERMISTOR
8 – 2
SJD24NSLG
L-band c
SEC. D-D
Figure A-7
(WHITE)
(WHITE)

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sj-d28n-slgSj-d29n-slgSj-d24n-slg

Table of Contents