Section I; Filter Installation; Section I. Filter Installation - Pentair Meteor 20 Owner's Manual

Sand filter system
Table of Contents

Advertisement

SECTION I.

FILTER INSTALLATION.

1. The filter should be mounted on a level concrete slab. Position the filter
so that the instructions, warnings and pressure gauge are visible to the
operator. Also, position the filter so that the piping connections, control
valve and drain port are convenient and accessible for servicing and
winterizing.
2. Install electrical controls (e.g., on/off switches, timers, control systems,
etc.) at least five (5) feet from the filter. This will allow you enough
room to stand clear of the filter during system start up.
3. Provide sufficient clearance around the filter to permit visual
verification that the clamp is properly installed, see Figure 1.
4. Provide sufficient space above the filter to remove the control valve for
cleaning and servicing. This distance will vary with the model of filter you are using. See Table 1 for the required verticl
clearance.
5. Make all plumbing connections in accordance with local plumbing and building codes. Filter plumbing connections are
provided with an O-ring seal. Use only a silicone based lubricant on the O-rings. Do not use pipe joint compound, glue or
solvent on the bulkhead connections to avoid damage to the O-rings.
For Multiport control valves with threaded ports use only Teflon tape, 100% pure Teflon paste (non-petroleum base),
Permatex #2 sealant on all threaded pipe connections, except fittings with O-rings. Use of other pipe joint compounds can
damage components of this system and cause leaks. For control valves with slip ports, use only ABS to PVC solvent welding
adhesive.
6. For the maximum working pressure of this filter see Table 1. Never subject this filter to pressure in excess of this amount -
even when conducting hydrostatic pressure tests. Pressures above maximum working pressure can cause the valve or other
plumbing to be blown off, which can result in severe injury, death or property damage.
When performing hydrostatic pressure tests or when testing for external leaks of the completed filtration and plumbing
system, insure that the Maximum Pressure that the filtration system will be subjected to DOES NOT EXCEED THE
MAXIMUM WORKING PRESSURE OF ANY OF THE COMPONENTS CONTAINED WITHIN THE SYSTEM. In
most cases, the maximum pressure will be stated on each component of the system.
If doubt exists as to the pressure to which the system will be subjected, install an ASME approved automatic Pressure Relief
or Pressure Regulator in the circulation system for the lowest working pressure of any of the components in the system.
P/N • Núm/Pte. • Réf. 9 9 1 0 2 0 0 0
l i F
r e t
r A
a e
M
d o
l e
s
. q
. t f
8 1
. 1
3 6
0 2
2
0 .
2 2
2
5 .
6 2
3
5 .
0 3
4
6 .
C A U TIO N
Table 1.
b L
. s
f o
a S
d n
M
x a
o w
k r
g n i
e r
. q
r p
s e
u s
e r
0 8
5 3
p
i s
1
0 3
5 3
p
i s
1
0 5
0 5
p
i s
2
5 2
0 5
p
i s
3
0 5
0 5
p
i s
2
Figure 1.
V
t r e
a c i
C l
e l
r a
n a
e c
R
q e
r i u
d e
5 4
. n i
5 4
. n i
5 4
. n i
9 4
. n i
1 5
. n i
Re v. C 5-1 1-0 1

Advertisement

Table of Contents
loading

This manual is also suitable for:

Meteor 26Meteor 18Meteor 30Meteor 22

Table of Contents