14-3. MUH-07RV -
OUTDOOR UNIT
OPERATING PROCEDURE
1. Removing the cabinet
(1) Remove the screws for the top panel.
(2) Remove the screw for the service panel.
(3) Remove the screws for the cabinet.
(4) Remove the screws for the front panel and motor support.
(5) Remove the service panel, and remove the screw from
the insides.
(6) Remove the top panel.
(7) Remove the cabinet.
Photo 3
Screw for
service panel
2. Removing the deicer P.C. board
(1) Remove the service panel and the cabinet.
(2) Disconnect all the connectors and the terminals on the
deicer P.C. board.
(3) Remove the deicer P.C. board.
MUH-09RV -
E1
E1
Screw for
top panel
Service
panel
MUH-12RV -
E1
Photo 1
Screws
for
cabinet
Photo 2
Photo 4
Screw
152
PHOTOS
Screws for front panel and motor support
Screws for cabinet
Screw for
top panel
Screws for
cabinet
Deicer
Screws
P.C. board
Relay panel
Terminal
block