4. Service. Installation and start-up
1.
Place the machine on a fl at
waterproof surface.
2.
Connect the factory-supplied tube to the cold water feed using a ½" R- connection
piece. Make sure no folding or sharp bending occurs when you push the machine
back in place.
If the water pipeline is new, fl ush the system with water fi rst to remove
copper shavings. These can damage the inlet valve.
3.
Open the water tap.
4.
Hit the ON/OFF switch inside the panel.
The water tank will fi ll automatically with
1.8 litres of water.
The element will not be powered until the water
reaches the level indicator.
the temperature is set to 85º Celsius.
5.
Shut the panel door. The mash machine is ready
to be used within approx. 10 minutes.
Connect the plug to an
earthed 230V 10A wall outlet.
Note: Make sure air is able to circulate freely
behind the machine.
8.
Fast Mash New
ON/OFF
switch
Need help?
Do you have a question about the Fast Mash New and is the answer not in the manual?