INSTALLATION

This pump is built to provide years of service if installed prop-
erly and attached to a suitable foundation. A base of concrete
weighing 2
1
/
times the weight of the pump is recommended.
2
(Check the shipping ticket for pump weight.)
If possible, tie the concrete pad in with the finished floor. Use
foundation bolts and larger pipe-sleeves to give room for final
bolt location. (See Figure 6A.)
LEVELING OF PUMP BASE
FIGURE 6B
ON CONCRETE FOUNDATION
ALLOW 1" FOR SHIMS.
PLACE ON BOTH SIDES
OF ANCHOR BOLTS

LEVELING

Place the pump on its concrete foundation supporting it with
steel wedges or shims totaling 1" in thickness. These wedges
or shims should be put on both sides of each anchor-bolt to
provide a means of leveling the base. (See Figure 6B.)
4
FIGURE 6A
INSTALLATION OF
FOUNDATION BOLTS
NOTE:
TO KEEP SHIMS IN PLACE
ALLOW NON-SHRINKING
GROUT TO FLOW AROUND
HOLD DOWN LUGS
PUMP BASE
IT IS VERY IMPORTANT THAT THE PUMP-BASE BE SET
LEVEL TO AVOID ANY MECHANICAL DIFFICULTIES WITH
THE MOTOR OR PUMP. THIS PUMP WAS PROPERLY
ALIGNED (IF FURNISHED WITH A MOTOR) AT THE FACTORY.
HOWEVER, SINCE ALL PUMP BASES ARE FLEXIBLE THEY
MAY SPRING AND TWIST DURING SHIPMENT. DON'T PIPE
THE PUMP UNTIL IT IS REALIGNED. AFTER PIPING IS
COMPLETED AND AFTER THE PUMP IS GROUTED-IN AND
BOLTED-DOWN, ALIGN IT AGAIN. IT MAY BE NECESSARY
TO RE-ADJUST THE ALIGNMENT FROM TIME TO TIME
WHILE THE UNIT AND FOUNDATION ARE NEW.
PIPE SLEEVE
BUILT-UP
CONCRETE FOUNDATION
GROUT ONLY TO
TOP OF BASE RAIL
PUMP BASE RAIL
GROUT
FOUNDATION BOLT
WASHER
CONCRETE FOUNDATION