Cisco 12012 Installation Instructions Manual page 11

Gigabit switch router cablemanagement kit
Table of Contents

Advertisement

Proceeding from the bottom port to the top port (for line cards with multiple ports only)
Step 4
identify the interface cable that connects to each line card port. Connect the interface
cable to the line card port. (Refer to Figure 5a.)
Proceeding from the bottom port to the top port (for line cards with multiple ports only),
Step 5
carefully press the interface cable into the vertical cable-management bracket clip. Avoid
any kinks or sharp bends in the interface cable. (Refer to Figure 5b.)
Proceeding from the bottom port to the top port (for line cards with multiple ports only),
Step 6
route the interface cable up the vertical cable-management bracket and carefully press the
interface cable into the rest of the cable clips. (Refer to Figure 5c.)
Figure 5
Installing the Interface Cables in a Vertical Cable-Management Bracket
Chassis
cable-management
tray
a
Interface
cable
Line card
cable-management
bracket
Repeat Step 3 through Step 6 for the rest of the interface cables to the line card.
Cisco 12012 Gigabit Switch Router Cable- Management Kit Installation Instructions
Removing and Replacing the Cable-Management System
b
Cable clip
c
Cable clips
11

Advertisement

Table of Contents
loading

This manual is also suitable for:

Acs-gsr12-ccblmAcs-gsr-lccblm

Table of Contents