Hot water sanitizing upright door dishmachine (55 pages)
Summary of Contents for Ecolab OMEGA 5E
Page 1
CHEMICAL SANITIZING DISHMACHINE Manufactured in the United States by: INSTALLATION & OPERATION MANUAL FOR ECOLAB MODEL: OMEGA 5E www.ecolab.com October 4, 2007 P/N 7610-003-28-32 (Revision A)
Page 3
DATE 04-02-2007 Release to production. 08-20-2007 Corrected dimension from 38” to 39”. 30, 35 08-27-2007 Added two Ecolab numbers. Removed total cycle time of 130. 2, 7 09-07-2007 Corrected booster heater cover to say control box cover. 10-04-2007 7934 Changed cover on power junction box.
Page 4
NOMENCLATURE FOR THE MODELS COVERED IN THIS MANUAL OMEGA-5E Omega 5E - Chemical sanitizing, electrically-heated dishmachine Model: Serial No.: Installation Date: Service Rep. Name: Phone No.:...
Page 5
Switch Panel Assembly Tub Assembly Frame & Motor Assembly Pump and Motor Assembly Booster Tank Assembly Incoming Plumbing Assembly Door Components Front Panel Assembly Retrofit Kit, Switch Box Assembly VII. ELECTRICAL DIAGRAMS OMEGA 5E (115 Volt, 60 Hz, Single Phase)
NOTE: Always refer to the machine data plate for specific electrical and water requirements. The material provided on this page is for reference only and may be subject to change without notice. Omega 5E Installation & Operation Manual 7610-003-28-32 Issued: 04-03-2007 Revised: 09-07-2007...
Page 10
However, rough handling by carriers or others may damage the unit while in transit. If this situation does occur, do not return the unit to Ecolab; instead contact the carrier and ask them to inspect the damage to the unit and to com- plete an inspection report.
NOTE: Always refer to the machine data plate for specific electrical and water requirements. The material provided on this page is for reference only and may be subject to change without notice. Omega 5E Installation & Operation Manual 7610-003-28-32 Issued: 04-03-2007 Revised: N/A...
(20 ±5 PSI is required). If the water pressure is correct then the fill valve cam will need adjustment. Use the following steps to adjust the cam. A. Turn power off at the machine circuit breaker. B. Open control box cover Omega 5E Installation & Operation Manual 7610-003-28-32 Issued: 04-03-2007 Revised: 09-07-2007...
Page 13
A. At the end of mealtime, move the “ON/OFF” switch to the “OFF” position. B. Open doors and manually remove drain stopper to drain the unit. C. Remove and clean upper and lower wash arms. D. Remove and clean the sump strainer. Omega 5E Installation & Operation Manual 7610-003-28-32 Issued: 04-03-2007 Revised: N/A...
TO PREPARE PUMPS FOR OPERATION The OMEGA 5E dishmachines are supplied with detergent, rinse additive and sanitizer dispensing chemical feeder pumps. Locate the open ends of the chemical tubes with the tube stiffeners and place each one in the appropriate container.
The adjustment for sanitizer volume must be made with the right side of the cam. To increase the volume the notch should be increased or to decrease the amount of sanitizer the notch should be closed slightly in increments until the correct level is reached. Omega 5E Installation & Operation Manual 7610-003-28-32 Issued: 04-03-2007 Revised: N/A...
Page 16
CAM 8: Cam 8 is an adjustable cam and is not used. Omega 5E Installation & Operation Manual 7610-003-28-32 Issued: 04-03-2007 Revised: N/A...
Page 18
Always ensure that strainers are placed back in the machine before operation and that they lay flat in the tub. You may wish to contact your Ecolab representative in order to learn more about how your water hardness will effect the per- formance of your machine.
Page 20
2. Verify that chemical concentrations for detergent are correct for the given water conditions. 3. Verify that none of the wash or rinse arms have clogged nozzles. 4. Ensure that the unit is filling to the correct water level. Omega 5E Installation & Operation Manual 7610-003-28-32 Issued: 04-03-2007 Revised: N/A...
Page 22
Before beginning any machine. The actual maintenance steps, however, apply to step that involves working with wiring, ensure that the steps any Parker style solenoid valve found on a Ecolab dishma- located in the section entitled “Preparation” have been per- chine.
Page 23
6. Remove the wire nuts from the wires and separate them. bly. Only use the pipe wrench enough to where you can spin the valve bonnet off with your hand. Omega 5E Installation & Operation Manual 7610-003-28-32 Issued: 04-03-2007 Revised: N/A...
Page 24
This will help ensure that your valve remains leak-free in the future! Diaphragm showing (1) pilot port and (2) extension hole Omega 5E Installation & Operation Manual 7610-003-28-32 Issued: 04-03-2007 Revised: N/A...
Page 25
Ecolab No.: 96580683 fouling it. Mfg. No.: N/A 3/4” 110/240 Volt Solenoid Valve Complete Assembly Ecolab No.: 85260511 Mfg. No.: N/A View inside the solenoid valve body Omega 5E Installation & Operation Manual 7610-003-28-32 Issued: 04-03-2007 Revised: N/A...
Screw the bonnet assembly snugly down on the body assembly. Ecolab No.: 85260511 Mfg. No.: 04810-100-53-00 Possible Problems: Hole #2 Pilot port extension Clogged. #1 clogged. Clean Pass heated hole. straight pin through hole. Omega 5E Installation & Operation Manual 7610-003-28-32 Issued: 04-03-2007 Revised: N/A...
05700-002-52-34 Tubing, 1/4’’ OD x 60” Long, White See Page 24 05700-002-52-33 Tubing, 1/4’’ OD x 60” Long, Red See Page 24 05700-011-63-18 Terminal Board (Not Shown) 96030424 05940-001-97-91 Omega 5E Installation & Operation Manual 7610-003-28-32 Issued: 04-03-2007 Revised: N/A...
SECTION 6: PARTS SECTION FRAME AND MOTOR ASSEMBLY See Motor Assembly Page See Plumbing Assembly Page See Booster Assembly Page See Frame Assembly Page Omega 5E Installation & Operation Manual 7610-003-28-32 Issued: 04-03-2007 Revised: N/A...
Need help?
Do you have a question about the OMEGA 5E and is the answer not in the manual?
Questions and answers
PLEASE INDICATE WHAT TYPE OF BACKFLOW PROTECTION IS REQUIRED FOR CHEMICAL INJECTION. OMEGA 5E