Beretta IDRA MS 150 LE Installation And Operation Manual
Beretta IDRA MS 150 LE Installation And Operation Manual

Beretta IDRA MS 150 LE Installation And Operation Manual

Solar storage cylinder

Advertisement

Quick Links

Installation and Operation Manual
IDRA MS 150 LE
Solar | Solar storage cylinder
EN
Installation and Operation Manual

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the IDRA MS 150 LE and is the answer not in the manual?

Questions and answers

Summary of Contents for Beretta IDRA MS 150 LE

  • Page 1 Installation and Operation Manual IDRA MS 150 LE Solar | Solar storage cylinder Installation and Operation Manual...
  • Page 2 This manual contains important instructions and precautions that must be observed to ensure the trouble-free installation and efficient functioning of your solar storage cylinder. Please accept our renewed thanks for your purchase, Beretta Conformity CONFORMITY storage cylinders conform to DIN 4753-3 and UNI EN 12897 standards.
  • Page 3 CONTENTS GENERAL . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4 General Safety Information .
  • Page 4: General

    GENERAL GENERAL SAFETY INFORMATION PRECAUTIONS The operation of any appliance that uses electrical power Check that the product is complete, undamaged and demands that a number of fundamental safety precautions as ordered as soon as you receive it. Report any dis- be respected.
  • Page 5: Description Of The Appliance

    This lists the technical specifications and performance of the product. The most important technical features of these solar stor- age cylinders are: Beretta Caldaie Via Risorgimento, 13 23900 Lecco (LC) - The storage cylinder and coil are specially designed BOLLITORE SOLARE...
  • Page 6: System Layout

    GENERAL SYSTEM LAYOUT Magnesium anode Flow regulator Storage cylinder Cock B Temperature gauge Pump Sleeve for electric heating element (not supplied) Pressure gauge Cylinder inspection flange Cock A Flange cover Fitting for expansion vessel Coil Safety valve outlet Sensor socket Safety valve (6 bar) Insulation Return valve R...
  • Page 7: Technical Specifications

    GENERAL TECHNICAL SPECIFICATIONS DESCRIPTION IDRA MS 150 FI LE Type of storage cylinder Vitrified Storage cylinder layout Vertical Heat exchanger layout Vertical Storage cylinder capacity Diameter of storage cylinder with insulation Height with insulation 1055 Insulation thickness Diameter/length of first magnesium anode 33/450 Flange diameter (external/internal) 183/130 - 120...
  • Page 8 GENERAL Pressure drops COIL PRESSURE DROP (mbar) 1000 FLOW RATE (l/h) Tests performed with a 30% glycol/water solution. Residual head Water outlet and return group RESIDUAL HEAD (mbar) FLOW RATE (l/h) Tests performed with water at 20°C. Flow regulator fully open.
  • Page 9: Water Circuit

    GENERAL WATER CIRCUIT TYPICAL WATER SYSTEM SCHEMATIC Solar collector Domestic hot water outlet Solar storage cylinder Outlet from boiler Collector probe Return to boiler Disconnect valves Collector outlet Non-return valve Collector return Safety valve DHW circulation Drain Domestic cold water inlet Expansion vessel Storage cylinder drain Pump...
  • Page 10: Location Of Sensors

    GENERAL LOCATION OF SENSORS storage cylinders are equipped with dedicated sockets for the storage cylinder TEMPERATURE IDRA MS FI LE GAUGE or TEMPERATURE SENSOR. The installer is responsible for making all necessary connections to the boiler and solar collectors. Installers must use their expertise to ensure proper installation and functioning in compliance with all applicable legislation.
  • Page 11: Overall Dimensions And Water Fittings

    GENERAL OVERALL DIMENSIONS AND WATER FITTINGS EAF (SB) (*) Hoses DESCRIPTION IDRA MS 150 FI LE Domestic hot water outlet 1” F Ø Outlet from solar collector 1” M Ø Return to solar collector 1” M Ø DHW recirculation 3/4” F Ø...
  • Page 12: Installer

    INSTALLER 10 UNPACKING THE PRODUCT If suitable equipment is not on hand to lift the storage cyl- inder off the pallet using the eyebolt, proceed as follows. - Place a platform of about half the height of the pallet storage cylinders are delivered in a IDRA MS FI LE near the storage cylinder.
  • Page 13: Place Of Installation

    INSTALLER 12 PLACE OF INSTALLATION 14 PREPARING FOR INITIAL STARTUP storage cylinders can be installed IDRA MS FI LE in any room where there is no specific requirement for an - Connect the safety valve drain to a pipe (T) to avoid electrical protection rating higher than IP X0D.
  • Page 14: Initial Startup

    TECHNICAL ASSISTANCE CENTRE FLUSHING THE SYSTEM ADJUSTING THE FLOW - Turn the knobs of the outlet and return valves (M) and Correct flow adjustment is essential to proper functioning (R) fully anti-clockwise of the entire system. - Close the flow regulator (V) (so that the screw slot is Set the flow regulator (V) fully open (see figure above).
  • Page 15: Checks During And After Initial Start-Up

    TECHNICAL ASSISTANCE CENTRE - Check that the solar collector circuit has been prop- erly bled Position of the knob of the valve R - M Flow stopped 90° 90° 0° 0° Upward flow only (non-return valve function) Outlet Return group group - Check that the pressure of the system when cold is approximately 3 bar...
  • Page 16: Temporary Shutdown

    TECHNICAL ASSISTANCE CENTRE 17 TEMPORARY SHUTDOWN REPLACING THE PUMP Perform the following operations before starting work to re- place the pump (C): If you are going away for a short period of time like a week- - Switch the electricity supply to the storage cylinder’s end or a short holiday, etc., and outdoor temperatures are valve group and to any associated boiler OFF at the going to remain above ZERO, proceed as follows.
  • Page 17: Troubleshooting

    TECHNICAL ASSISTANCE CENTRE 20 CLEANING AND REMOVING Cleaning inside the storage cylinder - Remove the screws (4) INTERNAL COMPONENTS - Remove the flange cover (5) - Remove the insulation (6) EXTERNAL CLEANING - Unscrew the bolts (7) and remove the cover (8) Clean the outside of the storage cylinder with a soft cloth - Remove the seal (9) damped in soapy water.
  • Page 18: End User

    END USER END USER INSTRUCTIONS Refer to the GENERAL SAFETY INFORMATION and PRECAUTIONS section for safety-related information. 23 START-UP 24 TEMPORARY SHUTDOWN The storage cylinder must be put into service for the first To reduce impact on the environment and save energy, time by personnel from the manufacturer’s Technical Assis- before leaving for the weekend or a short break, etc., pro- tance Centre.
  • Page 19 END USER...
  • Page 20 Commercial Offices: Via Risorgimento, 23 A 23900 - Lecco www.berettaboilers.com Beretta reserves the right to modify the characteristics and specifications given in this publication at any time and without prior notice as part of its policy of continuous product improvement.

Table of Contents