PREPARATION
BACK COVER FOR WIRE ARRANGEMENT
Connect the cables as necessary.
1
To connect additional equipment, see the External Equipment Setup section.
2
Install the CABLE MANAGEMENT as shown.
3
Bundle the cables using the supplied twister holder.
(This Feature is not available for all models.)
8
CABLE MANAGEMENT
TWISTER HOLDER
How to remove the CABLE
MANAGEMENT
Hold the CABLE MANAGEMENT
G G
with both hands and pull it upward.
NOTE
!
Do not hold the CABLE MANAGEMENT
G G
when moving the product.
- If the product is dropped, you may be
injured or the product may be broken.
Need help?
Do you have a question about the 32LCD7D-AB and is the answer not in the manual?