Weil-McLain Evergreen EVG 70 Manual page 92

Condensing gas boiler
Table of Contents

Advertisement

®
g
Startup — fi ll the system
Freeze pro tection (if used)
Follow these guidelines to prevent
possibility of severe personal injury,
death or substantial property damage:
Use only the products listed by Weil-
McLain for use with this boiler. See
page 127 for information.
Thoroughly fl ush any system that
has used glycol
new EVG boiler.
Review the material safety data
sheets (MSDS)
The MSDS contains information
on potential hazards and first aid
procedures for exposure or ingestion.
Check antifreeze inhibitor level at
least annually
and inhibitor levels may change
over time. Add antifreeze to increase
concentration if necessary. Add inhibitor
as needed to bring to acceptable level,
using inhibitor test kit to verify.
In addition to antifreeze and inhibitor,
use and maintain minimum level of
Sentinel X100 inhibitor as directed on
this page.
If using freeze protection fluid
with automatic fill,
meter to monitor water make-
up
. Freeze protection fl uid may leak
before the water begins to leak, causing
concentration to drop, reducing the
freeze protection level.
DO NOT exceed 50% antifreeze
by volume
. Antifreeze moves more
sluggishly than water and can interfere
with heat transfer. At antifreeze
concentrations higher than 50%, sludge
can develop in the boiler, potentially
causing damage to the heat exchanger.
Clean the system before filling
Always drain and flush the system
thoroughly before fi lling with antifreeze.
Sludge, iron oxide deposits and other
sediment in the system inhibit flow
and can cause rapid breakdown of
inhibitors.
Use only antifreeze recommended by
Weil-McLain.
Weil-McLain provides information for
application of the antifreeze products
listed in this document only for use
in Weil-McLain boilers. Do not apply
these products or instructions for
other applications. Local codes may
require a backfl ow preventer or actual
disconnection from city water supply.
92
as-fired water boiler —
before installing the
are available online.
. Glycol concentration
install a water
.
70/110/155
(continued)
7. Close the quick-fi ll water valve and purge valve and remove the hose.
Open all isolation valves. Watch that system pressure rises to correct
cold-fi ll pressure.
8. After the system has operated for a while, eliminate any residual air by
using the manual air vents located throughout the system.
9. If purge valves are not installed in system, open manual air vents in
system one at a time, beginning with lowest fl oor. Close vent when
water squirts out. Repeat with remaining vents.
10. Open automatic air vent (diaphragm-type or bladder-type expansion
tank systems only) one turn.
11. Starting on the lowest fl oor, open air vents one at a time until water
squirts out.
12. Repeat with remaining vents.
13. Refi ll to correct pressure.
Use of X100 inhibitor is REQUIRED
The boiler must have Sentinel X100 inhibitor added to the
system to prevent damage to the boiler heat exchanger.
1. The boiler is shipped with Sentinel X100 inhibitor and Sentinel X100
Quick Test Kit. See Repair Parts at the end of this manual for re-ordering
information.
2. After fi lling the system as directed in these instructions, use a caulking
gun to inject the X100 inhibitor into the system, following the
instructions on the tube.
3. Inject all of the inhibitor supplied in the Kit. Allow time for the water
to circulate and mix. Then check the inhibitor level. Add additional
inhibitor if necessary.
Check/verify water chemistry
1. The system may have residual substances that could affect water
chemistry.
2. After the system has been fi lled and leak tested, verify water pH and
chloride concentrations are acceptable.
3. Verify antifreeze concentration, if used.
4. Follow the instructions on the Sentinel test kit to sample the system
water and verify inhibitor concentration.
Check inhibitor concentration annually
1. Test the pH of a sample of system water at least annually. The pH of
the water mixture must be between 7.0 and 8.5. (Or use the Sentinel
inhibitor test kit to check concentration.)
2. If pH is outside this range (or inhibitor test kit indicates low level), the
inhibitor level may not be suffi cient to prevent corrosion.
3. Test antifreeze concentration.
Test antifreeze concentration at least annually. If concentration
is low, add antifreeze or drain system and refi ll with correct
mixture.
4. Follow instructions on antifreeze container to determine the amount
of antifreeze needed.
DO NOT
of antifreeze.
5. Check inhibitor level after adjustments are made.
Boiler Manual
exceed 50% by volume concentration
Part number 550-100-191/0917

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Evergreen evg 155Evergreen evg 110

Table of Contents