Weil-McLain Evergreen EVG 70 Manual page 12

Condensing gas boiler
Table of Contents

Advertisement

®
g
Wall-mounting the boiler
(continued)
Figure 6
Boiler mounting studs
6. When the brackets are engaged correctly, the bottom of
the boiler enclosure will be at or near the pencil line, or
tape, you applied in step 2.
7. Adjust the studs properly until engaged with the bracket
and the boiler slips into the correct position.
When mounting the boiler, use the method
described on step 2, page 11 to ensure the
mounting studs are properly engaged. If not,
the boiler could fall. Failure to comply could
result in severe personal injury, death or
substantial property damage.
8. Ensure boiler is level front-to-back.
Ensure boiler is NOT pitched upward
with the front of the boiler higher than
the back of the boiler. This can prevent
condensate from draining properly. Failure
to comply could result in severe personal
injury, death or substantial property damage.
12
as-fired water boiler —
70/110/155
Floor Stand Assembly
Floor Standing
The boiler is heavy, and requires two people to
lift and place upright. Use caution not to drop
the boiler or cause bodily injury while lifting
and handling. Wear non-slip gloves to prevent
possibility of cuts from sheet metal edges.
After the boiler is removed from the shipping
carton, DO NOT allow the boiler to sit on its
bottom, before stand is installed. Doing so may
3
result in damage to the condensate dish.
1. Carefully remove boiler from styrofoam protective base and set
on back. Remove door from front of boiler by loosening screw
on top of boiler and unfastening latches on side of cabinet.
2. Remove four (4) 5/16" studs from fl oor stand hardware trim
bag. Install studs by hand in rivet nuts on bottom of Evergreen
boiler. See Figure 7 .
3. Remove front access panel from stand assembly using 5/16"
driver.
4. Align holes in top of stand with studs on bottom of boiler.
Slide stand over studs. Remove 5/16" nuts from trim bag.
Install nuts on studs using ½" socket or wrench. Make sure
to align sides of stand with cabinet before tightening down
nuts. Do not overtighten.
5. Install the condensate trap assembly following instructions
on page 52
6. After confi rming nuts are tightened, obtain assistance and lift
the boiler into upright position.
7. Set boiler in place and level by adjusting leveling legs with
fl at head screwdriver.
Figure 7
Floor stand assembly (front access panel
removed)
ure
nal
ge.
Boiler Manual
Part number 550-100-191/0917
®

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Evergreen evg 155Evergreen evg 110

Table of Contents