Weil-McLain Evergreen EVG 70 Manual page 57

Condensing gas boiler
Table of Contents

Advertisement

®
g
Field wiring
C. 120 VAC to Boiler Circulator –
Boiler circulator terminal block to P4 on Control module (terminal block)
1. Provides 120VAC to the boiler circulator at Boiler circulator terminal.
2. Terminals are: 1 (H), 2 (N), 3 (G).
3. Maximum load: 2.0 amps (use relay if circulator load is higher). See
WARNING above.
4. The boiler circulator (shipped loose with boiler) is used in the boiler loop
of the primary/secondary piping. Primary/secondary piping is required to
be used with the Evergreen® boiler to ensure proper fl ow through the heat
exchanger.
D. Inputs 1, 2 and 3 (tstats, end switches, etc.) –
Terminal Strip P11 (input 1) & Terminal Strip P15 (inputs 2 & 3) (EVG control module)
1. Input 1 – Terminal Strip P11 – 4 & 5 (EVG control module)
2. Input 2 – Terminal Strip P15 – 1 & 2 (EVG control module)
3. Input 3 – Terminal Strip P15 – 3 & 4 (EVG control module)
4. These three inputs on each boiler can indicate a call for heat to the control
by means of a dry contact closure (thermostat, aquastat, or switch). (See
right and Figure 60, page 62 ).
5. The control provides inputs for up to three zones or three systems (priorities).
The control default setting is for three space heating zones tied to
PRIORITY 2, which is defaulted to FINNED TUBE BASEBOARD
system type.
6. For DHW applications, the aquastat can be connected to one of the
three input/output pairs. Take advantage of factory default settings by
using PRIORITY 1 for the DHW system. The default control setting for
PRIORITY 1 is a direct-piped DHW system type.
7. The default control setting uses each input (INPUT 1, INPUT 2, and
INPUT 3) to control its respective 120VAC output (OUTPUT 1, OUTPUT 2,
and OUTPUT 3).
Use of 0–10VDC input for modulation disables Input 1 from
creating calls for heat. See page 61 for instructions.
An input can be assigned to an AUX PUMP/OUTPUT function to
operate a system pump or interlock with a combustion air damper.
Inputs assigned for this function cannot be used for heat demand
operation. See page 82 and page 83 for more information on the
setup and selection of operating conditions.
Thermostats
circuits (Input1, Input2 and Input3 in Figure 60, page 62 ) or
attempt to supply 24 volts for any other application.
For thermostats that require a continuous 24-volt power
source, connect the common wire ("C") to P11 Pin 2 (see
Figure 60, page 62 ). Do NOT exceed total amp draw per thermostat.
Part number 550-100-191/0917
as-fired water boiler —
(see wiring diagram, Figure 60, page 62 ) (continued)
REQUIRED
supply 24-volt power to the thermostat
DO NOT
Boiler Manual
70/110/155
See Figure 60, page 62 for details.
As needed for systems
See Figure 60, page 62 for details.
— If using 3-wire zone valves, use
Zone valves
relays to provide dry contacts to the Control
thermostat connections. The zone valve end
switches of 3-wire valves carry 24 VAC from the
valve.
Thermostat anticipator setting
— 0.1 amps.
57

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Evergreen evg 155Evergreen evg 110

Table of Contents