4 – Commissioning the 9900TS Terminal Station
4.1
Purpose
The purpose of this task is to carry out:
site adjustment of the RT unit (also called RT or RT radio),
initialization and configuration of the RT unit and NT unit parameters,
checking and validation of the installed parameters before rendering the equipment operational.
4.2
Commissioning the RT unit
4.2.1 – Equipment required
To configure the parameters and carry out site adjustment of the RT unit, the following equipment is required:
the RT unit,
the RIT tool (Radio Installation Tool),
Potentiometer
Field Gauge
3CC11095AAAA TQ BJA 02
Alarm indicator
On/Off switch
Receiving indicator
N connector to
NIT tool
Figure 33 – RIT tool
Issue 02 - January 04, 2000
PC and headset
cable connector
On/Off indicator
Rear view
BNO connector
N connector to
to RT unit
Front view of equipment in
transport pouch
RT unit
45/68

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents