Battery Installation/Replacement

In the event a battery replacement is required, please complete the installation steps as detailed below.
1.
Remove enclosure cover by unscrewing four, corner cover screws and discard the cover (the cover will not be used
again).
2.
Squeeze the connector latch on the battery connector on the circuit board and clarefully pull on the connector to
remove it from the circuit board pins contacts. Do NOT pull on the connector wires. If the connector is stuck, it may
need to be gently rocked back and forth while pulling.
3.
Remove battery from unit and safely discard (see "Battery Disposal" on page 16).
(1-11)
Cover on
Figure 15: Enclosure Cover Removal
Connector
Latch
Figure 16: Battery Connector
Figure 17: Battery Removal
Installation & Operation Manual
Cover Off
Page 15