Table of Contents

Advertisement

Available languages

Available languages

● Always handle nails and package carefully.
If dropped, the collated nails may break or come
loose. In such cases, do not use the nails because,
if used in that condition, nail feed may become faulty
and result in missed nails or jamming of the nails.
● After nailing:
1) disconnect air hose from the Nailer;
2) remove all nails from the Nailer;
3) supply 5 – 10 drops of Hitachi pneumatic tool
lubricant into the air plug on the Nailer; and
4) open the petcock on the air compressor tank to
drain any moisture.

ADJUSTING THE NAILING DEPTH

To assure that each nail penetrates to the same depth, be
sure that:
1) the air pressure to the Nailer remains constant
(regulator is installed and working properly), and
2) the Nailer is always held fi rmly against the workpiece.
<NV83A2>
If nails are driven too deep or shallow into the workpiece,
adjust the nailing depth in the following order.
1 DISCONNECT AIR HOSE FROM NAILER.
2 If nails are driven too deep, turn the adjuster to the
shallow side.
If nails are driven too shallow, turn the adjuster to the
deep side.
3 Stop turning the adjuster when a suitable position is
reached for a nailing test.
4 Connect the air hose.
ALWAYS WEAR EYE PROTECTION.
Perform a nailing test.
5 DISCONNECT AIR HOSE FROM NAILER.
6 Choose a suitable position for the adjuster.
Shallow
Adjuster
Flush
Too deep
Deep
1 5 Disconnect air
hose
Too shallow
English
19

Advertisement

Table of Contents
loading

This manual is also suitable for:

Nv 65acNv 83a2

Table of Contents