MM MI114 User Manual page 30

Batching controller
Table of Contents

Advertisement

Please refer to following diagram for control of time sequence
Brief description of control process(In combination with the time sequence diagram)
(1)
The indicators starts to run, waiting for trigger signal;
(2)
The trigger signal is received, t0 delay occurs, waiting for cargo to be loaded stable.
(3)
The time t0 is over; the indicator starts to calculate the average weight of cargo, with time duration
of t1. The value obtained from calculation serves as foundation for later catch weighing signal
(4)
The time t1 is over, waiting for activation of t2.
(5)
The time t2 is over, the channel signal for catch weighing is sent to make the cargo enter into
corresponding channels. The time for sending channel signal is t3.
(6)
The time t3 is over, and the signal is sent and the indicator judges once again if the weight returns to
zero zone. The next cycle can't be started only when the weight stays within zero zone
3. Upper and lower limit mode
After setting the upper and lower limit value, the instruction under operation will send real time the signal
at the output end according to the actual weight.
MI114 Manual
Schematic Diagram of Control Process 5
28

Advertisement

Table of Contents
loading

Table of Contents