Porsche 944 Workshop Manual page 62

Porsche automobile workshop manual
Hide thumbs Also See for 944:
Table of Contents

Advertisement

10
Engine/Crankcase
25. Disconnect leads from starting
motor and remove starting motor.
26. Remove clutch actuating cylinder
from bell housing. (Leave line
connected). Unbolt and remove
holder for line from upper
crankcase half.
27. Disconnect exhaust from flange of
exhaust manifold and disconnect
exhaust extraction line. Remove
oxygen-sensor cable from bodywork.
28. Disconnect flange downstream of
catalytic converter and suspension and
remove system.
29. Remove upper transaxle/bell
housing mounting bolts.
30. Disconnect coolant hoses for
heating above exhaust manifold
and from cylinder head.
10 - 106
Removing and Installing Engine
31. Attach VW Special Tool 3033
suspension beam to transport
bracket of engine as follows:
Pulley end:
Flywheel end:
In position 2, the threaded rod is
beneath" the suspension beam. In
position 12, the threaded rod is
"above" the beam.
32. Tighten workshop crane e.g.
Bilstein K750 H slightly to take
part af engine weight and remove
support beam 10 - 222A.
Note:
Threaded rod af support beam
10 - 222A remains in front
suspension eye.
33. Remove lower transaxle/bell
housing mounting bolts.
Position 2
Position 12
Printed in Germany
944

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

944 s944 s2944 1987

Table of Contents