Porsche 944 Workshop Manual page 22

Porsche automobile workshop manual
Hide thumbs Also See for 944:
Table of Contents

Advertisement

03
Initiale the air-conditioning control terminal
41
testing step.
Display:
Switch on the air-conditioning system.
The LED must go off and the display will
appear after approx. 3 s.
Display:
If this is not the case, an error has occurred
in
the area of the air-conditioning system's
wiring.
In the event of an error, check with reference
to the circuit diagram.
Do not switch off the air-conditioning system.
03 - 10
Maintenance, Self-diagnosis
Initiate the air-conditioning control terminal
40
testing step.
Display:
Switch off the air conditioning system.
The LED must go off and the display will
appear after approx. 3 s.
Display:
If this is not the case, an error has occurred
in
the area of the air-conditioning system's
wiring.
In the even! of an error, check with reference
to the circuit diagram.
Actuator and input signal function checking
Printed in Germany - XVI, 1987
944

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

944 s944 s2944 1987

Table of Contents