Varmebaronen VIKING BIO 200 Installation And Maintenance Manual

Varmebaronen VIKING BIO 200 Installation And Maintenance Manual

Pellet

Advertisement

1 3 1 2 1 0 f w3 9 1 r e v 2 e n
Installation and maintenance
Pellet burner

Advertisement

Table of Contents
loading

Summary of Contents for Varmebaronen VIKING BIO 200

  • Page 1 1 3 1 2 1 0 f w3 9 1 r e v 2 e n Installation and maintenance Pellet burner...
  • Page 3 Notes To be completed by the installation engineer when the Viking Bio 200 is installed. Add a printout from the flue gas analysis instrument. Serial number: ............................Installation date: ............................Location of rating plate Installed in boiler, make/type: ............................Installation engineer: ............................
  • Page 4 Contents Värmebaronen Viking Bio 200...
  • Page 5: Safety And Handling

    Check that the delivery is complete. power supply. A chimney-sweep must be contacted before a The Viking Bio 200 is designed to fire wood pellets different type of fuel is used. after it has been installed on a boiler in a boiler...
  • Page 6: Operation

    To simplify installation and maintenance, The Viking Bio 200 can be installed on a the burner has quick attachments that make conventional oil or wood-fired boiler. it easy to attach the burner to the boiler and remove it.
  • Page 7: Technical Data

    RSK no. Screw 1500 mm 3301 639 07 47 Screw 2500 mm 3302 639 07 48 Pellet store 200 3306 639 07 94 Temperature sensor 3310 621 05 58 Spacer 3323 621 05 60 Värmebaronen Viking Bio 200...
  • Page 8: Installation

    Install the burner and lock the quick attachments. The combustion is affected by the draught. Therefore, Check that the burner is tight against the gasket on the stable draught conditions are the objective. flange. Värmebaronen Viking Bio 200...
  • Page 9 - The thermal relay on the downpipe. The spring must be tightened around the downpipe. Push the cover plate against the downpipe. Fit the burner's cover and tighten the screws. Check that no cable has been caught and that the electrical connections cannot be touched. Värmebaronen Viking Bio 200...
  • Page 10 The size of a weekly store depends on the building's heating requirements. Feed auger Fuel is supplied to the VIKING BIO 200 from a pellet store by an external feed auger. Fit the feed auger motor on the feed auger. Tighten the 40°±5°...
  • Page 11 AND THERMOSTAT hatch can be opened and the burner's connection cable GREY ALARM 230V/1A is attached in such a way that it has to be disconnected from the burner to allow the hatch to be opened. Värmebaronen Viking Bio 200...
  • Page 12 The on/off temperatures are set in the 'On/off temperature range' menu on the burner. BLUE YELLOW/GREEN The boiler's thermostat has no function/impact on the BLACK burner. BROWN ALARM 230V/1A GREY SAFETY SWITCH Värmebaronen Viking Bio 200...
  • Page 13 L1 B4 S3 T2 T1 N: neutral conductor, blue. : earth conductor, PE, yellow/green. L1 B4 S3 T2 T1 L1: supply via overheating protection, black. 230 V~ B4: boiler thermostat, brown. S3: alarm signal, 230 V~, grey. Värmebaronen Viking Bio 200...
  • Page 14 In such case, a change of boiler should be considered. • increase the burner's capacity. A modern pellet boiler produces high efficiency and is • install flue lining tubes. more straightforward to use. Värmebaronen Viking Bio 200...
  • Page 15 - higher, reduce the fuel volume in the 'fuel' menu using -. Wait 5 minutes after a fuel volume adjustment before measuring the CO again. Repeat until the average value for CO is 10-15%. Then measure the CO content, which should be < 300 ppm. Värmebaronen Viking Bio 200...
  • Page 16 Overview Alarm display Home/start Information Normal display [1]2 1[2] X °C X °C X °C min X °C min X °C max X h total X °C max Larm 1 Varning 1 07:58 2013-07-01 13-07-01 07:58 Larm 2 Varning 2 09:15 2013-05-04 13-05-04 09:15 Larm 3...
  • Page 17 Screensaver after 5 minutes Alternately: Wants to report something when the screensaver is active. Settings [1]2 1[2] Varning! Med felaktiga inställningar påverkas 100 h bränslemängd, livslängd och miljö Senaste injustering: 2013-07-03 Net access 70 °C 80 °C ------------------- QWERTYUIOPÅ ASDFGHJKLÖÄ ZXCVBNM Program update...
  • Page 18 Varning 1 X h total 13-07-01 07:58 Varning 2 13-05-04 09:15 Varning 3 13-03-08 07:58 Varning 2 13-01-03 07:58 Alarm list Larm 1 07:58 2013-07-01 Larm 2 09:15 2013-05-04 Larm 3 07:58 2013-03-08 Larm 4 07:58 2013-01-03 Värmebaronen Viking Bio 200...
  • Page 19 Settings [ 1 ] 2 Settings 1 [ 2 ] [1]2 1[2] Adjust sweeping interval for boiler Continued on the next page 100 h Language selection Temperature range on/off Off temperature 80 °C On temperature 70 °C Värmebaronen Viking Bio 200...
  • Page 20 Setting/adjustment [ 1 ] 23 1 [2] 3 [1] 2 3 Continued on the next page Pellet diameter Power modes Date/time Point to • 75% 2013-07-01 the field • 100% 13:40 to be • switching, changed, 75-100% adjust with +/- Värmebaronen Viking Bio 200...
  • Page 21 Point to the 1[2] 2013-07-01 field to be 13:40 Varning! Med felaktiga inställningar påverkas changed, bränslemängd, livslängd och miljö adjust with Senaste injustering: 03/07/2013 Pellet diameter Power modes • 75% • 100% • switching, 75-100% Ash removal interval Värmebaronen Viking Bio 200...
  • Page 22 Med felaktiga inställningar påverkas bränslemängd, livslängd och miljö Senaste injustering: 2013-07-03 sensor Automatic must be start up in connected high power before the mode selection is made Automatic [1] 2 3 start up in low power mode Värmebaronen Viking Bio 200...
  • Page 23 Setting/adjustment 12 [ 3 ] [1]2 1 2[3] Reset to Manual ash removal factory setting 1[2] Total reset Varning! Med felaktiga inställningar påverkas bränslemängd, livslängd och miljö Senaste injustering: 2013-07-03 [1] 2 3 1 [2] 3 Värmebaronen Viking Bio 200...
  • Page 24: Pellet Firing

    Do not confuse sintered ash with the easily removable is a risk of condensation forming in the chimney. Try to ash cakes or ash balls that may be found in the shorten the turbulators until the flue gas temperature is combustion chamber. suitable. Värmebaronen Viking Bio 200...
  • Page 25 Seasonal changes mean that it can often be a good idea to change the power mode several times a year. Värmebaronen Viking Bio 200...
  • Page 26: Operation, Start To Stop

    Start conditions • Overheating protection and any hatch switch closed. • Alarm reset. • The thermostat or the burner's temperature control are requesting heat. • The burner receives pellets. Värmebaronen Viking Bio 200...
  • Page 27 • When the cooling phase has been completed, the burner is switched to 'not in operation': or 'burner stopped': depending on whether the burner was switched off or the thermostat cut the power. Värmebaronen Viking Bio 200...
  • Page 28: Operation And Maintenance

    • fan with fan guard. • flame monitoring. Each time you clean, check the condition of the parts • blockage if the ambient temperature is too high. in contact with flames. These are the inner burner pipe, Värmebaronen Viking Bio 200...
  • Page 29 Turn half a turn until the arrow points Pellet stop downwards. 7. Refit the inner burner pipe and tighten the locking screw. The pellet stop must be in a horizontal position. Ignition element tool Ignition element cover Ignition element Värmebaronen Viking Bio 200...
  • Page 30: Troubleshooting

    C. The quick coupler part on the hose must be filled or before the burner is detached from the with pellets. If this is not the case, check the boiler. inclination of the feed auger and its insertion into the pellet store. Värmebaronen Viking Bio 200...
  • Page 31 Defective ignition element Defective or dirty flame guard. Draught too high. Back-pressure in boiler too high. Fan RPM too low Defective fan. Contaminants braking the fan mechanically. External sensor Sensor activated not mounted Sensor interruption Värmebaronen Viking Bio 200...
  • Page 32 Inner burner pipe 711552 Pellet stop 711628 Pellet sheet 711633 Ignition element, divisible 100740 Split pin 440121 Ignition element with cable 700503 Hairpin 711616 Ignition element cover 711631 Ignition element holder 711637 End wall, complete Ignition element Värmebaronen Viking Bio 200...
  • Page 33 24 25 26 Värmebaronen Viking Bio 200...
  • Page 34 LIABILITY, OR TORT (INCLUDING NEGLIGENCE OR OTHERWISE) ARISING IN ANY WAY OUT OF THE USE OF THIS SOFTWARE, EVEN IF ADVISED OF THE POSSIBILITY OF SUCH DAMAGE. * For more information regarding this software license Contact H&D Wireless AB (support@hd-wireless.se). Värmebaronen Viking Bio 200...
  • Page 36 Varmebaronen UK 11 Back O'Hill, Stirling. FK8 1SH Tel. 01786 849 099 Fax 01786 849 098 www.varmebaronen.org info@varmebaronen.org...

Table of Contents