Assembly Instructions; New Construction - Delta ITG70LED Instructions Manual

Breezintegrity ventilation fan / led light
Table of Contents

Advertisement

ASSEMBLY INSTRUCTIONS

NEW CONSTRUCTION

Turn off power source. Review all safety precautions.
1. Attach the Duct Connector ❸ to the Fan Body ❶
2. Remove the wiring box cover from the Fan Body ❶ .
Remove the wiring knockout from the wiring box
cover with a flathead screwdriver (not included).
3. Place the Fan Body ❶ next to a ceiling joist
or wall stud. The fan body should be level and
perpendicular to the joist or stud.
4. Mount the Fan Body ❶ to the joist or stud using
nails (not included) where indicated.
5. Pull the wire through the hole and into the junction
box(not included), secure 120VAC house wiring
from the wall diagram on page4. 14AWG is the
smallest conductor that shall be used for branch-
circuit wiring.
Push the wires back through the hole. Reattach the
wiring box cover.
1
3
1
2
1
1
1
1
3
1
1
1
1
4
1
1
1
1
5
5
Model:
Joist or
wall stud
Joist or
Joist or
wall stud
wall stud
Joist or
wall stud
ITG70LED / VFB070B4LED1

Advertisement

Table of Contents
loading

This manual is also suitable for:

Vfb070b4led1

Table of Contents