Rinnai ES38 Owner's Operation And Installation Manual page 22

Energysaver gas direct vent wall furnace
Table of Contents

Advertisement

Flue Manifold Installation
4.lnstall the Terminal
Check that the terminal seal is in place. For
weatherboard walls, add the second seal next
to the terminal seal to compensate for
weather board angle.
From the outside insert the terminal into the
sleeve with the marking "TOP" at the top.
The left hand side locking tie should be
marked "LEFT".
I
Locking tie
6.
Lock the ties
Pulling hard on the left and right hand ties,
clip the ties over the notches inside the
sleeve. You should be able to pull the ties 2
or 3 notches past the starting point. Cut the
ties, leaving about 3/4 inch (20 mm) past the
notch. Bend the ties back into the sleeve and
parallel to the wall.
7.
Insert Inside Connection Assembly
Push the assembly into the terminal tube,
Locking ties
ensuring that the seal is in place on the
r=7
inner tube.
·
Attach the inside connection with 3
,-- '
screws. The inner connection can still
"f.... '
0
~
be turned to install the screws.
\.....
;o~
\
0
... _
\ 0
3 screws
-
,
00
22
Rinnai Corporation ES38 Manual
T
j
I
ermma
i
'
I
Sleeve

Advertisement

Table of Contents
loading

Table of Contents