Preparation; Unpacking; Checking The Code Number - ABB EXGP Installation Manual

Table of Contents

Advertisement

2 PREPARATION

2.1 Unpacking

Caution. The probe is very fragile. Unpack and
handle with care.
Each probe is despatched with its components individually
placed within a common pack. Remove the probe from its
packing as follows:
a) Place the polystyrene pack, top uppermost, on a flat
surface and cut the tapes holding the two halves together.
b) Carefully lift the top half of the pack to gain access to the
probe components which are individually located within the
bottom half.
c) When removing the components from the pack take great
care to support the probe head and not to twist or bend the
electrode assembly attached to it.
d) Reassemble the packing and retain for future use.
E
X
G
P
P
o r
b
e
L
e
n
g
h t
N
o
n
e
6
0
0
m
m
1
0
0
0
m
S
p
e
c
l a i
S
h
e
a
h t
N
o
n
e
n I
c
o
o l
y
A
u l
m
n i
S
p
e
c
l a i
S
a t
n
d
a
d r
I
e t
m
s
N
o
n
e
T
w
n i
g
F (
a l
n
g
e
4
m
8
0
0
o
u
s
P
o
c r
e
a l
n i
a l
n
d
T
y
p
e
C
9
5
m
o
u
n
e t
d
' ,
' R
y t
p
e
h t
r e
m
o
c
o
u
p
Table 2.1 Code Number Interpretation
2.2 Checking the Code Number – Fig. 2.1
Before installing the equipment, check the code number on the
probe – see Fig. 2.1.
Remove cover
1
retaining screws (x3)
Fig. 2.1 Checking the Code Number
e l
P
/ t
t P
1
3
%
R
h
B
S
4
9
3
) 7
2
Rotate cover
Check probe code
3
number against
Table 2.1
Code No.
TEST GAS
THC
KEEP
AIR
TIGHTLY
REF
CLOSED
I/P
WHEN NOT
IN USE
Serial No.
E
X
G
P
/
X
X
X
0
0
1
2
9
0
1
2
9
0
1
0
0

Advertisement

Table of Contents
loading

Table of Contents