Generator Maintenance - Cebora SYNSTAR 200 M Instruction Manual

Wire welding machine
Hide thumbs Also See for SYNSTAR 200 M:
Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 10
for more than 2 seconds only once the adjustment bar
appears on the display screen A.
(Arc Lenght - Spot Time - 3L - HSA - CRA - Pause Time
- Inductance, Burnback – Soft Start - Pre Gas - Post Gas
- LCD Contrast)
8 MAINTENANCE
All
maintenance
jobs
must
be
performed
by
professional personnel according to the CEI 26-29
(IEC 60974-4) standard.

8.1 GENERATOR MAINTENANCE

In case of maintenance inside the appliance, make sure
the switch F is in "O" position and that the power supply
cable is disconnected from the mains.
Periodically, also clean the inside of the appliance and
remove any metal dust using compressed air.
8.2
HOW TO PROCEED AFTER MAKING REPAIRS.
After making repairs, always ensure the wires are fully
insulated between the primary side and the secondary
side of the machine. Avoid the wires coming into contact
with moving parts or parts that heat up during operation.
Fit all the clamps back as on the original machine so as to
avoid any contact between the primary and secondary in
case of accidental lead breakage or disconnection.
Also fit the screws back on with the toothed washers as
on the original machine.
17

Advertisement

Table of Contents
loading

Table of Contents