Gear Assembly P3/Gear Assembly P2; Base Assembly P3/Base Assembly P2; Arm Assembly Idler Jog Or Arm Assembly Idler Jog - Aiwa Microplate Reader Service Manual

Stereo video cassette recorder
Table of Contents

Advertisement

QQ
3 7 63 1515 0
DECK MECHANISM DISASSEMBLY
Gear Assembly P3
Optional Parts
TE
L 13942296513
Arm Assembly Idler
(For Normal Models)
31. Gear Assembly P3 (Fig. A-10-1)/
Gear Assembly P2 (Fig. A-10-2)
1) Unhook the two Hooks(H1) and lift up the Gear Assembly P3.
2) Unhook the two Hooks(H2) and lift up the Gear Assembly P2.
32. Base Assembly P3 (Fig. A-10-3)/
Base Assembly P2 (Fig. A-10-4)
1) Move the Base Assembly P3 in the direction of the arrow of
the Chassis Hole(A) and push down the Base Assembly P3.
2) Move the Base Assembly P2 in the direction of the arrow of
the Chassis Hole(B) and push down the Base Assembly P2.
33. Arm Assembly Idler or Arm Assembly
Idler Jog(Fig. A-10-5)
www
1) Unhook the Hook(H3) and push down the Arm Assembly
Idler Jog.
.
http://www.xiaoyu163.com
(A)
(B)
Gear Assembly P2
or
Arm Assembly Idler Jog
(
)
For Jog Shuttle Models
(Fig. A-10-5)
x
ao
u163
y
i
http://www.xiaoyu163.com
2 9
8
(Fig. A-10-1)
Gear Assembly P3
H1
(A)
Q Q
3
6 7
1 3
1 5
(H3)
(Fig. A-10-3)
Base Assembly P3
Fig. A-10
NOTE
1) Arm Assembly Idler is for Normal Models.
2) Arm Assembly Idler Jog is for Jog Shuttle Models.
NOTE
1) When reassembling, confirm that the (A) Part of the Gear
Assembly P3 is aligned to the (B) Part of the Gear Assembly
P2 as shown below.
(Unloading Condition)
co
.
65
9 4
2 8
H2
Gear Assembly P2
(Fig. A-10-2)
(B)
Chassis
0 5
8
2 9
9 4
2 8
Base Assembly P2
(Fig. A-10-4)
Gear Assembly P3
(A)
m
(B)
Gear Assembly P2
9 9
9 9

Advertisement

Table of Contents
loading

Table of Contents