Unpacking; Installation; Preparations - GE Consumer & Industrial VCO1000 User Manual

On-line vco series
Table of Contents

Advertisement

2.2

UNPACKING

The UPS shipping box contains:
a VCO Series UPS
USB cable (type B)
IEC female-male power cord (C13 <-> C14)
Mounting parts for tower and rack use
Inspect the UPS for damage after unpacking. If any damage is present please immediately notify the carrier and place of
purchase.
WARNING!
DO NOT connect any voltage to the unit
DO NOT put the unit into operation.
Condensation may occur if the UPS system is moved directly from a cold to a warm environment. The UPS system must
be absolutely dry before being installed. Please allow an acclimatization time of at least two hours prior to installation.
Save the original packing material. No liability can be accepted for any transport damage when the equipment is shipped
in non-original packaging.
2.3

INSTALLATION

2.3.1 PREPARATIONS

1.
Connect the batteries.
For safety reasons the batteries are not connected during transportation. To reconnect the batteries:
1.a. Open and remove the left part of the front panel,
the "battery door"
1.b. Connect the battery wires
red <-> red, black <-> black
1.c. Re-install and close the battery door.
modifications reserved
GE_UPS_OPM_VCO_XXX_1K0_3K0_XGB_V017
In case of recognizable damage:
GE
 RJ11 cable
 CD ROM with UPS monitoring software (see 2.5)
and its manual
 this manual
Fig. 2.3.1.a: connecting the battery
User manual - VCO Series UPS 1000-3000VA V017 - GB
Page 6/16

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Vco2000Vco3000

Table of Contents