METHOD
Identify the four pillars on which the PCB will be mounted. These are shown in black
squares on the drawing below (left).
The 20mm PCB Pillars should be screwed on to these (do not fit any extra nuts or
washers) then screw an M3 full nut on top of each of the new pillars.
Place an M3 plain washer on top of these and position the PCB so that the BNC
connectors are above the BNC connector on the existing main PCB.
Place an M3 plain washer on to the studs which now protrude through the new PCB and
screw an M3 full nut on to each.
DOCUMENT NUMBER AV102SS/OEM/01 REVISION 6.1
1st August 2006
Page 9 of 22