Purger Pump Out Procedure, With Auto-Purger On - Hansen APP08 Operator Installation & Instruction Manual

Auto-purger plus
Table of Contents

Advertisement

PURGER PUMP OUT PROCEDURE, WITH
AUTO-PURGER ON
1) Close the purge gas gauge valve to the water
bubbler.
2) Close the low-pressure pumped-liquid line shut-off
valve.
3) Close the foul gas line shut-off valve.
4) Close the water bubbler fill line valve.
The purger will pump down in several hours. To accelerate
the process, attach ammonia hoses to the oil drain valves
and pump out into a suction line. Close the low-pressure
liquid return line and the suction line to isolate the purger.
With electricity on, the pressure in the purger, as indicated
by both the high side pressure gauge and the low side
pressure gauge, should remain at zero. This process
should be completed only by knowledgeable refrigeration
technicians.
APP-001b
APR 2007
SECTION 6
SERVICE, MAINTENANCE & PARTS
14

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

AppcApp16App24

Table of Contents