Chapter 3. Installation And Assembly; Installation Conditions; Installing Ground - Pioneer RM-V4000V Technical Manual

Multi projection unit projection screen kit projection frame projection cabinet
Table of Contents

Advertisement

CHAPTER 3. INSTALLATION AND ASSEMBLY

1. INSTALLATION CONDITIONS

(1) Installing Ground

1 Ground
The ground must be flat and horizontal. It should be able to bear the weight of the system.
For wooden floors, if the part receiving the weight of the system lies at the center between the reinforcement beams below the
floor, the floor may become deformed or may curve inwards. In such cases, lay a more than 12 mm thick board below the
system to distribute the weight of the system on the floor.
For concrete floors, it may not be possible to install the system horizontally due to the roughness of the floor. In such cases, do
the same as above.
When installing the system on a installation table, always place the screen unit and cabinet on the same level of the installa-
tion table. The screen should also be more than 15 mm inside the edges of the installation table.
More than 15 mm
2 How to culculate weight
Example : 40-inch Cube
16screens
RM-V4000V (Multi-Projection Unit)
RMS-V4011 (Projection Screen Kit)
RMF-V4011 (Projection Frame)
RMS-V112 (Projectin Install Table)
Note) Other than the above weights, the weight of the person installing the system are also added.
For 16 screens, about 3 to 4 persons=240 kg (15% of total weight).
The bottom of the screen is
not on the installation table.
(Fig.3-1)
50kg
16
= 800kg
11kg
16
= 176kg
27kg
16
= 432kg
54kg
4
= 216kg
Total : 1744 kg +
(screw, others)
25

Advertisement

Table of Contents
loading

Table of Contents