Propane Gas Installations - Intertek GPG 16 SEER Installation Instructions Manual

Single package gas-electric heating & cooling units
Table of Contents

Advertisement

The rating plate is stamped with the model number, type of gas and gas
input rating. Make sure the unit is equipped to operate on the type of
gas available. The gas line installation must comply with local codes, or in
the absence of local codes, with the latest edition of the National Fuel
Gas Code NFPA 54/ANSI Z223.1.
Natural Gas Connection
Refer to the Proper Piping Practice drawing for the general layout at the
unit. The following rules apply:
1. Use black iron pipe and fittings for the supply piping. The use of a
flex connector and/or copper piping is permitted as long as it is in
agreement with local codes.
2. Use pipe joint compound on male threads only. Pipe joint compound
must be resistant to the action of the fuel used.
3. Use ground joint unions.
4. Install a drip leg to trap dirt and moisture before it can enter the
gas valve. The drip leg must be a minimum of three inches long.
5. Use two pipe wrenches when making connection to the gas
valve to keep it from turning.
6. Install a manual shut-off valve in a convenient location (within
six feet of unit) between the meter and the unit.
7. Tighten all joints securely.
8. The unit must be connected to the building piping by one
of the following methods:
• Rigid metallic pipe and fittings
• Semirigid metallic tubing and metallic fittings (Aluminum
alloy tubing must not be used in exterior locations)
• Listed gas appliance connectors used in accordance with
the terms of their listing that are completely in the same
room as the equipment
• In the prior two methods above the connector or tubing
must be protected from physical and thermal damage.
Aluminum alloy tubing and connectors must be coated
to protect against external corrosion when in contact
with masonry, plaster or insulation or are subject to
repeated wettings by liquids (water - not rain water,
detergents or sewage)
NOTE: The unit gas supply entrance is factory sealed with
plugs. Keep plugs in place until gas supply is ready to be
installed. Once ready, replace the plugs with the supplied
grommets and install gas supply line.
G
P
C
AS
IPING
HECKS
There will be air in the gas supply line after testing for leaks on
a new installation. Therefore, the air must be bled from the
line by loosening the ground joint union until pure gas is
expelled. Tighten union and wait for five minutes until all gas
has been dissipated in the air. Be certain there is no open
flame in the vicinity during air bleeding procedure. The unit is
placed in operation by closing the main electrical disconnect
switch for the unit.

PROPANE GAS INSTALLATIONS

in Cubic Feet of Gas Per Hour (CFH)
Length of
Pipe in Feet
1/2
10
132
20
92
30
73
40
63
50
56
60
50
70
46
80
43
90
40
100
38
Pressure = .50 PSIG or less and Pressure Drop of 0.3" W.C. (Based
C FH =
H eating Value of G as (BTU/Cubic Foot)
GROMMET
Proper Piping Practice
IMPORTANT NOTE: Propane gas conversion kits must be installed
to convert units to propane gas. Contact the distributor or
refer to the specification sheet for your model for the correct
LP conversion kit(s).
7
Natural Gas Capacity of Pipe
Nominal Black Pipe Size (inches)
1
3/4
1 1/4
278
520
1050
190
350
730
152
285
590
130
245
500
115
215
440
105
195
400
96
180
370
90
170
350
84
160
320
79
150
305
on 0.60 Specific Gravity Gas)
BT UH Furnace Input
GROUND JOINT UNION
(INSTALLED AHEAD OF GAS VALVE)
1 1/2
1600
1100
980
760
670
610
560
530
490
460
MANUAL
SHUT-OFF
VALVE
DRIP LEG

Advertisement

Table of Contents
loading

This manual is also suitable for:

M series

Table of Contents