Siemens CX75 Service Manual page 40

Hide thumbs Also See for CX75:
Table of Contents

Advertisement

CX75 Level 2 Service Manual
Final Inspection:
The final inspection contains:
1) A 100% network test (location update, and set up call).
2) Refer to point 3.3.
3) A random sample checks of:
- Data reset (if required)
- Optical appearance
- complete function
4) Check if PIN-Code is activated (delete the PIN-Code if necessary).
Basis is the international standard of DIN ISO 2859.
Use Normal Sample Plan Level II and the Quality Border 0,4 for LSO.
Remark: All sample checks must be documented.
Copyright © Siemens Pte Ltd.
All Rights Reserved
COM D CCQ APAC SLI
Page 40 of 42
Siemens Technical Support Centre
Internal Use Only

Advertisement

Table of Contents
loading

Table of Contents