Checking Power and Ground To The CCB

The CCB circuit board is powered by the120 VAC Control Circuit Transformer (see pages
34-35) at the J2 Socket, pins 1 & 3 (see page 42). This procedure is performed to ensure the
120 VAC power is being supplied to the CCB.
1
Ensure the main breaker or disconnect switch is turned on.
2
Verify with an AC volt meter that proper voltage is present at the Power Distribution Block (see Figure 2 on
page 9 and pages 12-14).
3
Using an AC volt meter; set the volt meter to an AC voltage range just above 120 VAC.
4
Ensure 120 VAC power is supplied to the CCB. With the J2 plug installed in the J2 socket on the CCB
(page 42) insert the two volt meter probes into pins 1 & 3 of J2 plug as shown in the "Checking for 120
VAC" image below. Volt meter probes may have to be pressed firmly into plug to make contact with the
metal conductors inside. Voltage should be approximately 120 VAC.
5
If the measured voltage is approximately 120 VAC the CCB circuit board is receiving the correct power.
6
If the measured voltage is zero volts or considerably less than 120 VAC:
• Check the 120 VAC wiring between the CCB J2 socket and the 120 VAC Control Circuit Transformer
- ensure wiring is correct and connections are tight and making good contact.
• Check the J2 plug/socket connections on the CCB for wear or damage. Ensure they are mating
properly and providing good contact - see page 42.
• Check the 120 VAC Control Circuit Transformer to ensure it is wired correctly and outputting the
correct voltage - see pages 34-35.
• Check the Control Circuit fuses - see Figure 2 on page 9 for location and the Fuse test procedure on
page 17.
7
Ensure earth ground is supplied to the CCB. With the J2 plug installed in the J2 socket on the CCB
(page 42) insert the two volt meter probes into pins 1 & 2 of the J2 plug as shown in the "Checking for
Ground" image below. Volt meter probes may have to be pressed firmly into plug to make contact with the
metal conductors inside. If the measured voltage is approximately 120 VAC the CCB is properly grounded.
8
If the measured voltage is zero volts or considerably less than 120 VAC:
• Check the ground wiring between the CCB J2 socket and the water heater's ground connection -
ensure wiring is correct and connections are tight and making good contact.
• Ensure the water heater is properly grounded.
Checking for 120 VAC
Servicing should only be performed by a Qualified Service Agent
ELECTRONIC CONTROLS
46
Checking for Ground

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Dre-80Dre-120Dve-52Dve-80Dve-120

Table of Contents