F5 VIPRION 4800 Series Platform Manual page 92

Application delivery
Table of Contents

Advertisement

Repackaging Guidelines
7. Secure the red pallet mount brackets to both sides of the chassis using a #2 Phillips screwdriver and
ensure that the brackets are securely fastened to the pallet.
Use 18 to 20 inch-pounds (2.0 to 2.3 Newton-meters) of torque on these screws.
8. Place the ESD bag over the chassis.
9. Place the corrugated shroud over the chassis.
10. Place the foam insert for the power cables on top of the chassis.
11. Place the accessory tray on top of the foam insert.
12. Place the top over the corrugated shroud.
92

Hide quick links:

Advertisement

Table of Contents
loading

Related Products for F5 VIPRION 4800 Series

Table of Contents