Techne TE-10A Operator's Manual page 20

Thermoregulator
Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 1
5 Begin by securing the bridge piece to the bath. Use the two M4 countersunk stainless screws and
screw into the holes in the corners of the bath.
Use M4 countersunk
screws
6 Locate the thermoregulator above the bridge piece. Toggle the heating element carefully through the
clearance hole. Lower the thermoregulator onto the M4 threaded stud (1) and 3mm diameter stud
(2). Use the half-turn plastic fastener (3) to clamp down the thermoregulator.
7 Use the thumb screw (4) to secure the cover plate to the bridge. Bungs (5 and 6) are provided to seal
off the holes in the bridge piece. It is necessary to fit the bungs to reduce heat losses and prevent
steam or other vapours getting to the thermoregulator.
5
6
4
1
2
20
3

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Te-10dTu-20d

Table of Contents