Getting Started Guide
Intelligent Operator Panel (IOP)
Edition: January 2009
Warnings
During commissioning of the Inverter it is essential to ensure that the system is in a safe and
stable state, as some commissioning processes have the potential to start the motor. Therefore
it is important to secure any loads and ensure that should the motor start, no potentially
dangerous conditions exist.
The IOP can be fitted to and removed from the inverter while power is applied.
The IOP will set the USS PZD (P2012) length to 4 when connected to the inverter.
SINAMICS IOP, Getting Started Guide 01/09 - A5E02449215B2
1

Advertisement

Table of Contents
loading

Summary of Contents for Siemens SINAMICS IOP

  • Page 1 The IOP can be fitted to and removed from the inverter while power is applied.  The IOP will set the USS PZD (P2012) length to 4 when connected to the inverter. SINAMICS IOP, Getting Started Guide 01/09 - A5E02449215B2...
  • Page 2 Layout of IOP SINAMICS IOP, Getting Started Guide 01/09 - A5E02449215B2...
  • Page 3 Locking and unlocking the keypad To lock the IOP keypad press ESC and INFO simultaneously for 3 seconds or more. To unlock the keypad press ESC and INFO simultaneously for 3 seconds or more. SINAMICS IOP, Getting Started Guide 01/09 - A5E02449215B2...
  • Page 4: Menu Structure

    Menu structure SINAMICS IOP, Getting Started Guide 01/09 - A5E02449215B2...
  • Page 5: Initial Setup

    After the Identification screen has been displayed the main status screen is displayed. If the menus are not shown, press the OK wheel to display the menus. The status icons used on the menu are explained below. SINAMICS IOP, Getting Started Guide 01/09 - A5E02449215B2...
  • Page 6: Language Selection

    Press OK - the cursor will move to the minute field. Rotate the push-wheel until value of the minutes are correct. Using this technique change the day, month and year as required. SINAMICS IOP, Getting Started Guide 01/09 - A5E02449215B2...
  • Page 7: Getting Started

    Lasten gesichert sind und dass bei einem eventuellen Start des Motors keine gefährlichen Bedingungen bestehen.  Das IOP kann im spannungsführenden Zustand an den Umrichter angebaut bzw. entfernt werden.  Beim Anschluss an den Umrichter setzt das IOP die USS PZD-Länge (P2012) auf 4. SINAMICS IOP, Getting Started Guide 01/09 - A5E02449215B2...
  • Page 8 Layout des IOP SINAMICS IOP, Getting Started Guide 01/09 - A5E02449215B2...
  • Page 9 Drücken Sie für 3 Sekunden oder länger gleichzeitig die Tasten ESC und INFO, um das Tastenfeld des IOP zu sperren. Zum Entsperren desTastenfelds drücken Sie ebenfalls für 3 Sekunden oder länger gleichzeitig die Tasten ESC und INFO. SINAMICS IOP, Getting Started Guide 01/09 - A5E02449215B2...
  • Page 10 Nach der Anzeige des Identifikationsbildes erscheint die Hauptanzeige. Falls die Menüs nicht angezeigt werden, drücken Sie OK auf dem Navigationsrad, um die Menüs anzuzeigen. Die im Menü verwendeten Zustandssymbole sind nachfolgend erläutert. SINAMICS IOP, Getting Started Guide 01/09 - A5E02449215B2...
  • Page 11 Drücken Sie OK – der Cursor springt in das Minuten-Feld. Drehen Sie das Navigationsrad bis der korrekte Minuten-Wert erscheint. Gehen Sie analog dazu vor, um Tag, Monat und Jahr auf die gewünschten Werte einzustellen. SINAMICS IOP, Getting Started Guide 01/09 - A5E02449215B2...
  • Page 12 Printed in the EU (United Kingdom) *A5E02449215B2* SINAMICS IOP, Getting Started Guide 01/09 - A5E02449215B2...

Table of Contents