Installation Checklist; Schematic Diagram - Raymarine E70361 Installation Instructions Manual

Micro-talk micronet (wireless) to seatalkng gateway
Hide thumbs Also See for E70361:
Table of Contents

Advertisement

3.1 Installation checklist

Installation includes the following activities:
Installation Task
1
Plan your system.
2
Obtain all required equipment and tools.
3
Site all equipment.
4
Route all cables.
5
Drill cable and mounting holes.
6
Make all connections into equipment.
7
Secure all equipment in place.
8
Power on and test the system.

Schematic diagram

A schematic diagram is an essential part of planning any installation. It is also useful for any future
additions or maintenance of the system. The diagram should include:
• Location of all components.
• Connectors, cable types, routes and lengths.
22

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents