Preparing For Installation - LG LUTD4919SN Installation Manual

Double oven range
Hide thumbs Also See for LUTD4919SN:
Table of Contents

Advertisement

Preparing for Installation

Tools needed
Phillips screwdriver
Flat-blade screwdriver
Level
Pipe wrench (2)
(one for support)
Parts Provided
Template (1)
Anti-tip bracket kit (1)
Anchor sleeves (6)
Materials You May need
• Gas line shut-off valve
• Pipe joint sealant that resists action of natural and LP gases
• Flexible metal appliance connector (
Never use an old connector when installing a new range.
• Flare union adapter for connection to gas supply line (
• Flare union adapter for connection to pressure regulator on range (
• Liquid leak detector or soapy water
• Lag bolt or
/
" O.D. sleeve anchor (for concrete floors only)
1
2
1
Open-end or
adjustable wrench
Lag bolts (6)
/
" or
/
" NPT x
3
1
4
2
/
" Nut driver
Pliers
4
Drill
Safety glasses
Parts not Provided
4-Wire cord or
3-Wire cord
(UL approved 40 or 50
AMP)
/
" I.D.)
1
2
/
" or
/
" NPT x
/
" I.D.)
3
1
1
4
2
2
/
" NPT x
/
" I.D.)
1
1
2
2
INSTALLATION
15
Tape measure
Gloves
Strain relief
(For conduit
Installations only)

Advertisement

Table of Contents
loading

Table of Contents