Download Print this page

Operation; After Use; Daily Maintenance; Weekly Maintenance - Edic REVOLUTION Owner's Manual

Advertisement

PREPARATION
Remove furniture from cleaning area, and sweep or vacuum.
Protect from all types of overspray, any cabinets, painted surfaces, walls, carpets, and
other delicate materials by masking, using painter's tape, drop cloths, plastic, or spray
shields.
Identify the type of floor you are going to clean to insure that you are using the proper
chemicals, brushes and equipment and will not damage the floor.
After identifying the flooring, apply the appropriate pre-spray to the floor. To avoid longer
dry time before sealing, use only 5 minute dwell time or less and do not over wet the
surface.

OPERATION

(Pressure range of 700-1500 psi and temperature up to 200°F)
Connect the Revolution to the vacuum and solution hose from the extractor.
Turn on the extractor to engage the vacuum.
Make sure the bottom of the Revolution is flush with the surface to be cleaned to insure
proper suction.
Squeeze the trigger to release the solution and move the Revolution at a moderate rate
overlapping just enough to insure complete coverage. Moving too fast may create a spiral
pattern in the grout or tile.

AFTER USE

Disconnect hoses and inspect them for any damage.
Wipe the machine with a clean, soft damp cloth.
Store indoors, in a clean, dry place.
Do not store sitting on the brush.
Do not store in freezing temperatures.

DAILY MAINTENANCE

Clean and inspect hoses.
Check for loose hardware.
Clean machine with a clean, soft, damp cloth.

WEEKLY MAINTENANCE

Inspect and clean if necessary the stainless steel mesh filter after the quick disconnect.
Inspect spray jets. Do not adjust the angle of the tips.

Advertisement

loading