Delay Start Function; Cleaning And Routine Maintenance; Technical Specifications; Test Specification - Hoover DNH D8513AX-AUS Instruction Book

8 kg heat pump tumble dryer
Table of Contents

Advertisement

Delay Start Function

The Delay Start Function allows the user to delay the start of the drying cycle by 1 to 24 hours.
When the function is first selected the display will show a delay of 1 hour, subsequent presses of
the button will increase the delay with 1 hour steps.
To commence the programme press Start/Pause button and the appliance will complete the drying
cycle at the end of this time. The indicator light will flash to indicate that the start delay is in
progress.

Cancelling and Resetting the Programme

To cancel a programme press the Start/Pause button for 3 seconds. In the TIME CONTROL
display 0:00 Light will flash to indicate that it has been reset.

CLEANING AND ROUTINE MAINTENANCE

Cleaning the Dryer

Clean the filter and empty the water
container after every drying cycle.
● Regularly clean the filters.
After each period of use, wipe the inside of
the drum and leave the door open for a while to
allow circulation of air to dry it.
● Wipe the outside of the machine and the
door with a soft cloth.
DO NOT use abrasive pads or cleaning
agents.
● To prevent the door sticking or the build up
of fluff periodically clean the inner door and
gasket with a damp cloth.
WARNING! The Drum, door and load may
be very hot.
OPERATION

Technical Specifications

Drum capacity
Maximum load
Height
Width
Depth
Energy class

Test Specification

AS
2442.2
Max. Rating 8 kg.
Install and use discharge kit to evacuate the
Condensed water.
IMPORTANT Always switch off and remove
the plug from the electricity supply before
cleaning this appliance.
For electrical data refer to the rating label on
the front of the dryer cabinet (with the door open).
litres
115
See energy label
85 cm
60 cm
60 cm
See energy label
EN 13

Advertisement

Table of Contents
loading

Table of Contents