Lagoon 421 Owner's Manual page 31

Sailing catamaran
Table of Contents

Advertisement

LAUNCHING
R e c o m m e n d a t i o n s
A lot of skill and care is required to commission your LAGOON boat.
The proper working of all your boat equipments in the future results
from the quality of the commissioning operations.
The initial launching and the first tests of the different equipments
shall be carried out by your LAGOON dealer or agent so you can
expect to enjoy the warranty in case of some equipment failure.
RECOMMENDATION
All future maintenance should be carried out with the grea-
test care by professionals.
If the LAGOON boatyard is not involved in maintenance ope-
rations, your guarantee will not cover any incidents linked to
handling errors.
LAGOON 421
BEFORE LAUNCHING
- If your boat is to be fitted with sounder and speedometer, allow for
the relevant fittings and their installation.
- Check the water intake strain box for cleanliness.
- Check the engine and reduction gear oil levels (refer to engine ma-
nual).
- All the optional accessories shall be sealed with paste.
- Retract the speedometer into its housing (it may be damaged by
the handling belts).
- Turn off all the water inlet and drain valves (sink, washbasin,
heads, engine).
HOISTING
Install a fore rope, a rear rope and fenders.
Prepare:
- 2 Straps (minimum 11 meters).
- 4 slings (see diagram opposite).
- Attach the 4 slings to the belts.
3
LAUNCHING
29

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents