Download Print this page

Parr Instrument 6200 Operation Manual page 20

Calorimeter

Advertisement

Step 16
Rinse the bomb head and
cylinder.
Use distilled water and rinse
thoroughly.
Save the rinse water for further tests
as required.
Dry the bomb head, cylinder and
screw cap.
The bomb is now ready to
prepare for the next test.

Advertisement

loading

Related Products for Parr Instrument 6200