Place Of Installation; Installation In Older Systems And Systems Requiring Modernisation; Technical Assistance Service; Putting Into Service - Riello 7200/1 170 Plus Installer And User Manual

Solar storage cylinder
Table of Contents

Advertisement

12 PLAcE oF INSTALLATIoN

R
7200/1 Plus storage cylinders can be installed in any
room where there is no specific requirement for an electrical
protection rating higher than IP X0D.
9
Respect the minimum specified installation distances to
ensure correct installation and access for maintenance.
13 INSTALLATIoN IN oLDER SYSTEMS AND SYSTEMS
REqUIRINg MoDERNISATIoN
When installing
R
7200/1 Plus storage cylinders in old systems
or systems requiring modernisation, always perform the
following checks.
− Make sure that the system is fitted with safety and
control devices in accordance with applicable legislation
and standards
− Make sure that the central heating circuit has been
flushed out to remove all sludge and lime scale, and has
been vented and seal tested
− Make sure that a suitable water treatment system is
installed if the quality of the supply/recirculation water
so demands (refer to the reference values listed in the
table alongside).
REFERENCE VALUES
ph
Electrical conductivity
chlorine ions
Sulphuric acid ions
Total iron
Alkalinity M
Total hardness
Sulphur ions
Ammonia ions
Silicon ions
6-8
less than 200 μS/cm (25°c)
less than 50 ppm
less than 50 ppm
less than 0.3 ppm
less than 50 ppm
less than 35°F
none
none
less than 30 ppm

Technical Assistance Service

TEchNIcAL ASSISTANcE SERvIcE

14 PUTTINg INTo SERvIcE

It is essential to perform the following checks before starting up
or testing the functioning of the storage cylinder. In particular,
check that:
− The supply cocks in the domestic water circuit are all open
− The water connections to the solar storage cylinder's
valve group have been made correctly
− All the pipes in the water circuit have been insulated in
conformity to relevant standards
− The electrical connections of any accessories have been
made correctly, using the hoses provided to route the
cables. See page 9 as well as the manuals for all installed
accessories
− The solar collector circuit has been correctly flushed out
and filled with water-glycol mix, and all air has been bled
out of the circuit (see the manual for the solar collectors)
− Put the solar collectors into service. See the manuals for
the solar collectors and associated accessories.
once the system has been started up, perform the following
checks.
− Make sure that all pumps are free and rotate in the right
direction
− Check that the flow rate in the solar collector circuit is
equivalent to 30 l/h for each m
− check that the solar collector circuit has been properly
bled
− Turn the main power switch oFF and make sure that the
solar water heating system shuts down completely.
Provided the above checks have been completed satisfactorily,
restart the system and verify its performance.
11
TEchNIcAL ASSISTANcE SERvIcE
of collector area
2

Advertisement

Table of Contents
loading

Table of Contents