Pre-Installation Check - GE RX3i PROFINET User Manual

Pac systems
Hide thumbs Also See for RX3i PROFINET:
Table of Contents

Advertisement

Chapter 3. Installation

Pre-Installation Check

3.1
Upon receiving your RX3i equipment, carefully inspect all shipping containers for damage. If any part of
the system is damaged, notify the carrier immediately. The damaged shipping container should be saved
as evidence for inspection by the carrier.
As the consignee, it is your responsibility to register a claim with the carrier for damage incurred during
shipment. However, GE Automation and Controls will fully cooperate with you, should such action be
necessary.
After unpacking the RX3i equipment, record all serial numbers. Serial numbers are required if you should
need to contact Customer Care during the warranty period. All shipping containers and all packing
material should be saved should it be necessary to transport or ship any part of the system.
Verify that all components of the system have been received and that they agree with your order. If the
system received does not agree with your order, contact Customer Care.
If you need technical help, contact Technical Support. For phone numbers and email addresses, see the
General Contact Information page in the front of this manual.
28
PACSystems* RX3i PROFINET IO-Scanner User Manual
GFK-2737F

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the RX3i PROFINET and is the answer not in the manual?

Questions and answers

This manual is also suitable for:

Gfk-2737f

Table of Contents